  • Practice Note: From Technical Bankruptcy to Transformation—and Back Again

    When organizations replace their systems without changing the capabilities that made replacement necessary.

    A fresh start

    An organization has reached technical bankruptcy. Its systems still work, but maintaining and adapting them has become prohibitively expensive, risky, or slow. Years of accumulated technical debt have made replacement more attractive than continued evolution.

    Management launches a transformation program. Old applications will be replaced, business processes redesigned, and the application landscape modernized. Finally, an opportunity to leave the technical debt behind.

    Or is it?

    Déjà vu

    The transformation begins. New technologies, new architectures, new applications.

    But familiar problems soon emerge. Requirements are unclear. Architectural decisions are postponed. Testing starts too late. Delivery deadlines take precedence over quality. Shortcuts are accepted to keep the program moving. Technical debt starts accumulating before the new systems have even entered production.

    The organization is replacing technically bankrupt systems while already creating the debt of their successors.

    New systems, old capabilities

    Perhaps the problem was never primarily technical.

    The old systems accumulated debt because the organization struggled to manage requirements, architecture, quality, knowledge, and long-term product sustainability.

    Now it is attempting a transformation using essentially the same organizational capabilities. Hiring experienced consultants, establishing a program organization, and introducing new processes may compensate for capability deficiencies without actually resolving them.

    When the program ends, the organization inherits new systems, along with the technical debt accumulated during their development. And potentially the same capability deficiencies that contributed to the previous bankruptcy.

    Transformation isn’t capability development

    A transformation program is an intervention. Often an enormous and expensive one. It changes systems, technologies, processes, and sometimes organizational structures. But that doesn’t necessarily develop the capabilities needed to sustain them.

    Which capabilities were insufficient before the transformation? How did those deficiencies contribute to the deterioration of the old systems? And what is being done to prevent the same problems from recurring?

    These questions should be part of the transformation itself, not merely lessons learned afterwards. Otherwise, the organization may successfully replace its products without improving its ability to sustain them.

    Breaking the cycle

    A transformation provides an opportunity to do more than replace technically bankrupt systems. It provides an opportunity to develop the organizational capabilities needed to prevent the next technical bankruptcy.

    That means treating capability development as an explicit objective, alongside delivering the new systems. Not simply asking whether the new solution works, but whether the organization will be capable of sustaining it.

    Otherwise, the organization may transform its technology without transforming its capabilities.

    And the next technical bankruptcy may already be underway.

  • Practice Note: An Inconvenient DoD

    Everybody wants quality. Until quality gets in the way.

    Imagine a development team approaching an important deadline. The functionality has been implemented, the documentation updated, and the tests executed. But some tests have failed. Others haven’t been executed. And there are still questions about whether the solution meets its quality expectations.

    The deadline is tomorrow. Is the work done? That depends on the Definition of Done. And that’s where things become interesting.

    The Convenience of Being Done

    A Definition of Done (DoD) establishes the conditions under which work can be considered complete. In practice, many DoDs concentrate on activities: code reviewed, tests executed, documentation updated.

    These are useful activities. But completing them doesn’t necessarily mean achieving their intended results. A review can be completed with significant findings unresolved. Tests can be executed without passing. Documentation can be updated without becoming accurate.

    An activity-based DoD allows us to demonstrate that we’ve performed the expected work without necessarily demonstrating that we’ve achieved the expected quality. And that’s rather convenient when a deadline approaches.

    Three Questions About Done

    A meaningful Definition of Done should address three questions.

    1. Criteria: What must be true for the work to be considered done?

    We need to establish the quality expectations that apply to the result.

    2. Evidence: How do we establish that those criteria have been satisfied?

    Quality expectations aren’t enough. We need evidence supporting the conclusion that they’ve been met.

    3. Consequences: What happens when they haven’t?

    Suppose the evidence is insufficient, or demonstrates that the criteria haven’t been satisfied. Can we still declare the work done? Who decides? And what happens to the deadline?

    The first question defines our expectations. The second makes them verifiable.

    The third determines whether they actually matter.

    Why Quality Is Inconvenient

    Teams are expected to deliver. Project managers are expected to meet deadlines.

    Quality work can interfere with those expectations. Testing reveals defects. Reviews uncover problems. Analysis demonstrates that a solution isn’t fit for its intended purpose. Of course, quality work can prevent expensive rework and improve delivery performance. But those benefits aren’t always immediate.

    The cost of investigating a problem is visible today. The cost of failing to investigate it may emerge months later, perhaps in another team’s budget. A missed deadline is immediately visible. Insufficient quality may not be. This creates an incentive to prioritize what can be demonstrated now over what might matter later.

    And teams adapt to the expectations placed upon them. When defining their DoD, they may gravitate towards conditions they can reliably satisfy without jeopardizing delivery commitments. Not because they don’t care about quality, but because they’re responding to the organization’s actual priorities.

    The DoD becomes compatible with the incentives of the organization.

    The Convenient Quality Gate

    A DoD that says tests have been executed is easier to satisfy than one requiring specified tests to pass and unresolved failures to be evaluated. A DoD that says documentation has been updated is easier to satisfy than one requiring evidence that it’s accurate and sufficient for its intended users. The difference is that the second formulation may prevent the team from declaring the work done.

    We can make a DoD appear rigorous by specifying activities while leaving the evidence of quality insufficiently defined. Whether consciously or unconsciously, this allows us to avoid the consequences of a genuine quality gate.

    Other industries offer useful perspectives. In safety-critical aviation development, verification evidence is essential to demonstrating compliance. In medicine, surgical safety procedures establish checks that must be addressed before proceeding. Neither approach guarantees perfect outcomes. Nor should ordinary software development adopt their practices wholesale.

    But they illustrate an important principle:

    Quality obligations can be conditions for proceeding, rather than considerations to be abandoned when delivery becomes difficult.

    What Happens When We Aren’t Done?

    Suppose we’ve defined meaningful criteria and the evidence needed to demonstrate that they’ve been satisfied. Now the deadline arrives. The evidence is insufficient. What happens?

    We might delay delivery, reduce scope, complete the necessary verification, or explicitly accept certain risks where that’s permissible. These can all be legitimate decisions. The important point is that someone must make one. We can no longer quietly transform incomplete assurance into completed work.

    And that decision may be uncomfortable. It may affect commitments, budgets or schedules. Someone may have to accept responsibility for a risk they would rather not acknowledge. But that’s precisely why the Definition of Done matters.

    A quality gate that cannot influence a delivery decision isn’t much of a gate.

    The Real Test

    We often discuss Definitions of Done as methodological instruments. We debate their contents and how teams should formulate them.

    But perhaps the more important question is organizational:

    Are we prepared to accept the consequences of defining Done properly?

    If management rewards meeting deadlines while treating quality as negotiable, teams have little incentive to create a DoD that might prevent them from declaring success.

    The vague DoD is where the problem becomes visible. The organizational incentives may be where it originates. And imposing stricter DoDs won’t necessarily help if those incentives remain unchanged.

    A Definition of Done is most valuable when it tells us something we don’t want to hear. Everybody wants quality. Until quality gets in the way.

    That’s when we discover whether our Definition of Done is a genuine quality gate—or merely a convenient way to declare that we’re finished.

    The next time your team fails to meet its Definition of Done, ask yourself: what happens next?

    If the answer is “We deliver anyway”, perhaps the Definition of Done isn’t where the improvement needs to start.

    Improving quality isn’t always about introducing better practices. Sometimes it starts with understanding why the practices we already have aren’t allowed to work.

  • Practice Note: A Reference Model Is Not a Prescription

    Two teams use exactly the same testing practices.

    One receives a positive capability assessment. The other does not.

    Is the assessment inconsistent?

    Not necessarily.

    One team develops a relatively simple internal application. The other develops a safety-critical subsystem.

    The practices may be identical, but the expectations should not be.

    This raises an interesting question.

    How can a generic capability reference model remain useful when adequate capability depends on context?

    From Generic to Specific

    A capability reference model describes what an organization should be capable of doing, without necessarily prescribing how that capability must be realized.

    Consider Quality Assurance.

    A generic reference model might describe capabilities related to quality strategy, verification, validation, test design, defect management and quality evaluation.

    These concepts can apply across many organizations.

    But their realization depends on context.

    An organization developing medical devices faces different risks, obligations and quality expectations from one developing internal business applications.

    Even within the same organization, different products and subsystems may require different approaches.

    A safety-critical component might demand extensive traceability and formal verification. A user interface might place greater emphasis on usability and exploratory testing. A data integration component might require particular attention to data integrity and failure handling.

    The underlying capability concepts remain recognizable.

    What constitutes adequate capability changes.

    Contextualizing the Reference Model

    This suggests a progression:

    Generic capability → Organizational context → Product or subsystem context

    At the generic level, the reference model provides a common vocabulary and a basis for reasoning about capability.

    At the organizational level, we consider the organization’s objectives, responsibilities, operating environment, risks and constraints.

    At the product or subsystem level, we consider the specific characteristics and quality expectations of the subject being assessed.

    Each level adds context.

    But that doesn’t necessarily mean creating an entirely new capability model at every level.

    The reference model can remain conceptually stable while the expectations, evidence and appropriate realization become increasingly specific.

    For example, risk-based testing may be a relevant capability in both a business application and a safety-critical subsystem.

    But what constitutes sufficient risk analysis, test coverage and supporting evidence may differ substantially.

    The capability is recognizable in both contexts.

    Its adequate realization is not necessarily identical.

    Assessing Capability or Checking Compliance?

    This distinction matters because reference models can easily become checklists.

    Does the organization have a test strategy?

    Does it use automated testing?

    Does it perform reviews?

    Does it maintain traceability?

    These questions may be useful, but the existence of a practice doesn’t necessarily establish that the capability is adequate.

    An organization can perform all the expected activities while remaining unable to achieve the intended outcomes.

    Conversely, an organization may realize a capability effectively through practices that differ from those anticipated when the reference model was created.

    If we assess compliance with prescribed practices, we risk confusing the means with the capability.

    Capability assessment should evaluate fitness for purpose, not conformity to a universal implementation.

    This also means that identical practices need not produce identical assessment results.

    And different practices may legitimately support the same capability rating.

    The question is whether the subject can achieve what is required of it in its particular context.

    The Risk of Contextualizing Too Much

    There is a complication.

    If every organization, product or subsystem receives its own completely customized model, we may lose the consistency that made the reference model useful in the first place.

    Assessments become difficult to compare. Common capability concepts disappear behind local terminology. Improvement approaches become unnecessarily fragmented.

    But contextualizing too little creates the opposite problem.

    We evaluate subjects against generic expectations that may be irrelevant, insufficient or inappropriate.

    The challenge is therefore to distinguish between what should remain stable and what should vary.

    The reference model provides the conceptual structure.

    Context determines which capabilities matter, what adequate performance means and what evidence is needed to assess them.

    Sometimes the context may even reveal capabilities or dimensions missing from the generic model.

    That should be an opportunity to improve the reference model, rather than a reason to abandon it.

    A Reference Model Is Not a Prescription

    Perhaps the value of a capability reference model lies precisely in this distinction.

    It allows us to reason consistently about different subjects without assuming that they should all operate identically.

    It provides a shared language for understanding, assessing and developing capabilities.

    But it does not eliminate the need for professional judgment.

    We still need to understand the subject, its purpose, its environment and the outcomes it must achieve.

    Only then can we determine what adequate capability looks like.

    A reference model tells us what to reason about. Context tells us what good looks like.

  • Exploration: Is Moving Upstream a Professional Quality?

    A tester can execute tests perfectly against the wrong requirements.

    A developer can implement an elegant solution to the wrong problem.

    A project manager can deliver a project successfully without achieving the change it was intended to create.

    A consultant can implement an improvement initiative without improving anything.

    In each case, the professional may have performed the assigned work competently.

    But was it good professional work?

    Looking Beyond the Assignment

    Consider a tester who discovers that a requirement is ambiguous.

    The immediate response might be to request clarification so that testing can continue.

    But perhaps the ambiguity suggests a more fundamental problem with requirements management.

    And perhaps that problem originates in how stakeholders communicate, how decisions are made or how the organization understands customer needs.

    The tester can keep moving upstream.

    From testing to requirements. From requirements to product development. From product development to organizational decision-making.

    At each step, the question changes.

    Not simply How can I do my work better?

    But Why does this work need to be done, and what determines whether it creates value?

    This pattern isn’t unique to testing.

    A developer might question the architecture rather than simply implement another workaround.

    A project manager might question whether the planned deliverables will produce the intended outcomes.

    A consultant might question whether the requested intervention addresses the capability that actually needs improvement.

    In each case, moving upstream means looking beyond the immediate assignment toward the conditions and purposes that give it meaning.

    Is This Professional Development?

    We often associate professional development with increasing expertise.

    A tester becomes better at testing. A developer becomes better at programming. A consultant becomes more proficient in a methodology.

    But perhaps professional development also has another dimension.

    The ability to understand how one’s work contributes to something larger.

    That doesn’t necessarily mean moving into management or changing professions.

    A tester doesn’t need to become a business analyst to recognize weaknesses in requirements.

    A developer doesn’t need to become a product manager to question whether a feature solves the intended problem.

    And a consultant doesn’t need to become a strategist to recognize that implementing a framework is not the same as developing an organizational capability.

    Perhaps moving upstream isn’t about changing what we do.

    It’s about changing how we understand what we do.

    How Far Upstream?

    There is a problem with this reasoning.

    We can always ask another question.

    Why are the requirements poor? Why does the organization work this way? Why were these priorities chosen? Why does the business pursue these objectives?

    Eventually, questioning the purpose of the work can consume more attention than performing it.

    And not every upstream question is useful.

    Sometimes the problem is understood, the assignment is appropriate and the most valuable contribution is excellent execution.

    Specialization exists for good reasons. Deep expertise matters.

    A professional who continually challenges the assignment but cannot perform it well isn’t necessarily demonstrating superior professional quality.

    So perhaps moving upstream is not inherently better.

    The important quality might instead be knowing when the boundaries of the assignment prevent us from addressing the problem.

    And having the judgment to recognize when those boundaries should be questioned.

    When Implementation Becomes Easier

    AI adds another dimension to this question.

    As AI becomes increasingly capable of producing code, tests, documents, analyses and other artifacts, some implementation activities become easier.

    That doesn’t eliminate the need for expertise.

    But it may change where professional judgment contributes the most value.

    If producing a solution becomes easier, choosing the right problem becomes more important.

    AI can help implement what we ask for.

    It cannot make our intentions appropriate merely by implementing them successfully.

    Perhaps this makes the ability to move upstream more valuable.

    Not because everyone should become a strategist, but because the consequences of poorly understood intentions may become easier to realize.

    We may become increasingly effective at doing things without becoming equally effective at determining whether those things are worth doing.

    A Different Dimension of Professional Quality?

    Perhaps we should distinguish three things.

    Competence: Can I perform the assigned work well?

    Understanding: Do I know why the work matters?

    Judgment: Can I recognize when performing the assigned work well will not achieve its intended purpose?

    The first is essential.

    The second provides context.

    The third allows a professional to challenge the relationship between the assignment and its purpose.

    But even this distinction raises questions.

    How much upstream understanding should we expect from a professional?

    When does questioning an assignment demonstrate responsibility, and when does it become interference?

    Can organizations genuinely encourage professionals to challenge assumptions while continuing to evaluate them primarily on how efficiently they complete assigned tasks?

    And what happens when a professional recognizes an upstream problem but has no authority to influence it?

    Perhaps moving upstream is not simply an individual quality. It may also depend on whether the organization is capable of using the understanding that professionals develop.

    Perhaps the Question Is Different

    Maybe professional quality isn’t about moving upstream as far as possible.

    Nor is it about constantly questioning everything.

    It may be about retaining the ability to connect our work to its purpose, and recognizing when that connection is missing.

    A good professional knows how to perform the work.

    A better professional may also recognize when performing that work well is insufficient.

    But that leaves an uncomfortable question.

    If we recognize that the assignment will not achieve its intended purpose, is it still professional to complete it exactly as requested?

  • Practice Note: The Project Is Not the Subject of the Change

    Projects have a peculiar ability to become the center of attention.

    We establish plans, milestones, budgets, governance structures and reporting mechanisms. We monitor progress, manage risks and eventually determine whether the project succeeded.

    Yet the organization rarely wanted a project in the first place.

    It wanted something to change.

    A testing improvement project exists to improve testing capability. A system replacement project exists to change a system or product. A transformation programme exists to develop organizational capabilities.

    The project exists in service of that change.

    But this raises an interesting distinction.

    The Project Is a Subject Too

    A project can itself be understood as a subject.

    It has boundaries, responsibilities, capabilities and characteristics that can be assessed and improved.

    There is nothing wrong with managing a project as a subject.

    The problem arises when we confuse it with the subject it exists to change.

    Consider a system replacement project.

    The project is one subject: a temporary organization coordinating change.

    The system being replaced is another. The organizational capability depending on that system may be a third.

    Each can be understood, developed and assessed.

    But evidence about one does not necessarily tell us much about the others.

    Two Different Claims of Success

    Suppose a project finishes on schedule, within budget and with all agreed deliverables accepted.

    That is meaningful evidence about the project.

    But has the intended change occurred?

    Does the new system deliver the expected outcomes? Has the organizational capability improved? Have the risks that motivated the project been reduced?

    Those are different questions requiring different evidence.

    The difficulty is that project performance is often easier to observe than the effects of the change.

    Milestones can be counted. Deliverables can be accepted. Activities can be marked complete.

    Capability development and organizational outcomes are harder to assess.

    So the visible subject can gradually substitute for the important one.

    A training programme is completed, so competence is assumed to have improved.

    A process is implemented, so behaviour is assumed to have changed.

    A system goes live, so the transformation is considered successful.

    But completing an intervention is not evidence that it achieved its intended effect.

    The Project as an Intervention

    Seen from the perspective of the subject being changed, the project is a temporary mechanism for coordinating interventions.

    It may introduce technologies, practices, roles, structures or governance arrangements intended to move another subject toward a desired state.

    The project therefore contains an implicit hypothesis:

    If we perform these interventions, we expect the subject to change in these ways.

    The project plan describes what we currently believe is necessary to produce that change.

    But what happens when an intervention is completed and the expected effect does not appear?

    Simply completing the remaining activities more efficiently may not help.

    The evidence may be telling us that our understanding of the subject, or of how to change it, was incomplete.

    The ability to adjust the interventions then becomes more important than adherence to the original plan.

    The Temporary and the Continuing Subject

    There is another complication.

    Projects are deliberately temporary.

    We create them with the intention of eventually dismantling them.

    Project teams dissolve. Governance structures disappear. Budgets close. Responsibilities are transferred.

    But the subject being changed may need to continue for decades.

    During the project, considerable understanding accumulates within the temporary organization.

    People learn why decisions were made, which alternatives were rejected, what assumptions proved incorrect and where uncertainty remains.

    What happens to that understanding when the project disappears?

    Traditional handover often concentrates on transferring deliverables, documentation and operational responsibilities.

    But continuity requires more than possession of artifacts.

    Can those who inherit the subject understand why it is the way it is?

    Do they know what outcomes were intended, which assumptions shaped the solution and what remains uncertain?

    Can they continue assessing and developing the subject without depending on the people who participated in the project?

    A project may successfully deliver a new realization while leaving the organization poorly equipped to understand or evolve it.

    The project is supposed to disappear. The understanding required to continue the subject should not disappear with it.

    What Does Project Completion Mean?

    Perhaps project completion deserves a broader interpretation.

    We need evidence that the project has been managed effectively.

    We need different evidence that the intended change has occurred.

    And we need confidence that the organization can continue managing and developing the changed subject after the project has ended.

    The project doesn’t need to preserve itself.

    Its temporary structures can disappear.

    But the understanding, responsibility and ability to learn must continue somewhere.

    Because the project is not the subject of the change.

    It is the temporary subject responsible for helping another subject become something different — and remain capable of evolving afterward.